Usual Work

Malcolm heads out with Vic and a hired excavator
(our digger's tracks and sprockets need replacement)
Owen cutting material for welding tests
Ian cutting and .....
..... Paul drilling another length of rail
Boyd's crossing temporarily reinstated
Vic has spread the ballast ready for lifting and alignment