Vic watching Ian dismount the digger at engine curve |
Having tracked down the sleepers on the bank, Vic has the job described by Ian (who previously removed the track panel) |
Vic clearing ballast from the deck, then some sleepers being removed by Geoff & Ian to expose the spanning I beams on the abutment |
Geoff removing more deck over the north abutment, assisted by John & Dave |
Vic removing a ballast retaining stringer |
Showing an original Rayne & Burn side beam as Vic removes the sleeper deck |
John, Dave & Geoff clearing the top of the south abutment |
The bridge beams now opened up |