| The last waggon of 30' panels passing Causey |
![]() |
| Ian slinging a 30' panel |
![]() |
| Richard & John fishplating, Malcolm assisting |
![]() |
| Angela slinging a 30' panel ..... |
![]() |
| ..... and guiding it round the crane |
![]() |
| More temporary fishplating (to enable the crane to pass with the next panel) |
![]() |
| The last panel being led down |
![]() |
| Malcolm & Ian tipping out a 30' rail |
![]() |
| Angela cleaning a 60' rail as the 30' rails are removed |
![]() |
| A 60' rail being dropped in at the top of the bank |