Causey and the Woods



A usable but out of gauge sleeper is being pushed
through, to be redrilled & regauged
Dave, Rob & Geoff setting the gauge 
At Engine Curve, Rob & Geoff digging a
temporary drainage channel between sleepers
Ian digging a ditch to the east of Engine Curve
Dave & Rob clearing a field drain under the track
Ian clearing the east side of Engine Curve, to allow
slewing of the track to increase the radius 
Clearing old sleepers from the lineside