![]() |
Early morning delivery at Engine Curve - read on to find out what is happening |
![]() |
Vic on his way to work in Andrews House cutting |
![]() |
The works train passing Causey Crossing, loaded with CS1s |
At Engine Curve, Durham CC countryside volunteers fencing and lopping
around the footpath which separates the railway from walkers
![]() |
In East Tanfield bay, Geoff & Bill removing keys, ..... |
![]() |
..... fishplates & screws ..... |
![]() |
..... then the team swarm on the last 90 lb/yd panel |
![]() |
Bill & Nigel removing rails ..... |
![]() |
..... and Ian clears & levels the track bed |
![]() |
Ian unloading CS1 sleepers ..... |
![]() |
..... while others have their bait |
![]() |
Bill & Bob aligning sleepers in the bay |
![]() |
Nigel levitating a sleeper |
![]() |
The team at work, with John watching |
![]() |
Bill & Bob making reasonable progress |
![]() |
Loading the waggons with recovered track parts ..... |
![]() |
..... and returning past Causey Level Crossing |