Vic - ready for work & flailing near Terrace Junction
Loading & unloading the muscleman - to align ET main platform road
Installing a panel in the bay, to allow access for the ballast waggon
- Steve & Colin aligning sleepers, Colin &Steve pushing up a rail
Colin, Dave, Keith & Steve keying the panel .....
..... then fishplating
Ian loading ballast - which was dropped on the main platform road
- there are several hundred tons to drop, then align & pack
Removing keys & plates from the 95 lb/yd rail in the loop .....
..... then rails from the chairs .....
..... so that Ian can take the rail for use in the bay |