Tuesday, 26 August 2014

Tanfield on Track

Vic - ready for work & flailing near Terrace Junction

Loading & unloading the muscleman - to align ET main platform road

Installing a panel in the bay, to allow access for the ballast waggon
- Steve & Colin aligning sleepers, Colin &Steve pushing up a rail

Colin, Dave, Keith & Steve keying the panel .....

..... then fishplating

Ian loading ballast - which was dropped on the main platform road
- there are several hundred tons to drop, then align & pack

Removing keys & plates from the 95 lb/yd rail in the loop .....

..... then rails from the chairs .....

..... so that Ian can take the rail for use in the bay