Eric & Malcolm freeing a point rodding compensator for the revised installation at East Tanfield |
Ian & Brian straightening Horden's front buffer beam mount |
Dave drilling Horden's axlebox wear plates; Walter working on Cochrane's injector steam valve
Malcolm preparing to paint Twizell's handrails |
Steve & Ian fetching the old No.6 signal |
Ian slinging & Steve lifting out the cosmetic home signal protecting
the Tanfield Branch from eastbound Bowes railway traffic .....
..... and replacing it with the foreshortened old No.6 |
Steve taking the longer signal post down the line ..... |
..... towards where it will become the replacement No.6 |
Steve & Ian fitting Twizell's replacement regulator valve |