Dan & Dan cleaning Cochrane
![]() |
Dan & Stewart brushing Cochrane's tubes |
Guy the signalman at the carriage shed ground frame;
& exchanging tokens with David driving the works train
![]() |
A family outing on the works train |
![]() |
Ian unloading the jacker packer at East Tanfield |
![]() |
Dennis, Angela & Cameron levelling ET platform |
![]() |
Kyle & Cameron fastening down a replaced sleeper |
![]() |
Ethan, Euan & Dan levelling ballast in East Tanfield run round loop point |
![]() |
Callum, David, Chris & David remove a timber for replacement in the run round point |
More views of the track team at East Tanfield:
![]() |
Angela guiding & shovelling ballast on ET curve for the jacker packer |
![]() |
Chris & Steve replacing a point blade |
![]() |
The ballast shovellers |
![]() |
At Causey, an audience for AW No.2 ..... |
![]() |
..... Stewart oiling Cochrane ..... |
![]() |
..... & Ryan flagging his train into the headshunt |
Cochrane drawing its train into Causey station, & Ryan flagging it off
No comments:
Post a Comment