Steve, John, Colin & Dave dig around ..... 
..... the base of No.6 signal .....
..... so that Steve can fasten onto
& extract the rotten stump
Steve lifting the replacement post & Ian guiding it into place

Strapping the post vertically .....
.... so that it can be stone packed  & consolidated into position

Callum & Dave attaching ironwork to the post
Meanwhile the new No.5 signal post has been made
perpendicular; Colin & Steve pack the base
Steve drilling to attach ironwork, assisted by Steve & Colin