Dave & Chris checking AW No.2 before use |
![]() |
Peter planning loco work |
![]() |
Ian taking the new crossing gate out of the workshop ..... |
![]() |
..... & loading it onto a waggon for transport to the crossing |
![]() |
Malcolm helping to control the gate as it is unloaded |
![]() |
Rob, Chris, Malcolm & Dave helping to position the gate |
![]() |
Dave & John tightening hinge clamps |
![]() |
Levelling the gate |
![]() |
Chris guiding the gate back to the waggon ..... |
![]() |
..... to be transported back for alterations |
![]() |
Rob painting part of the gate |
![]() |
Ian taking coal to Twizell |
![]() |
Chris removing good tyres from the old dumper ..... |
![]() |
..... to replace those more worn on the new dumper |
![]() |
Dave mowing at Andrews House |
![]() |
Ian making sleeves |