| Richard removing a window catch from 49's cab ...... |
![]() |
| ..... adjusting the chains ..... |
![]() |
| ..... & watching the cab top being lifted from the loco |
![]() |
| Guiding the cab top to temporary storage in the pipe waggon ..... |
![]() |
| ..... followed by the chimney |
![]() |
| Ian operates the crane to lift the tank clear, rope guided by Jonny |
![]() |
| 20 tonnes of 2" dolomite being dropped - for the work at the side of the carriage shed |
![]() |
| Ian lifting a 2 tonne weight to check the safe load indicator ..... |
![]() |
| ..... before tackling No.49's boiler |
![]() |
| Jonny & Richard guiding the boiler as it is slewed away from the frames |
![]() |
| Jonny detaching the ashpan |
![]() |
| Safely on the bogie - smokebox to separate, the boiler away for repair |