Nigel heading off in the hired dumper with more fill ..... |
![]() |
..... & dropping it over the edge of the heap |
![]() |
Steve on our dumper ..... |
![]() |
..... emptying on the other side |
![]() |
Other than traffic jams, the job proceeds faster with two dumpers |
![]() |
The dig has been widened today |
![]() |
The spoil heap is growing at the edge of the site |
![]() |
Bill pumping grease to tension a track on our digger, after it came off again |
![]() |
Steve, Geoff & Bill erecting site fencing |
![]() |
Ian roughly levelling the base - we need to dig down tomorrow |
![]() |
Steve & Ian uncovering a ducted cable which is still in use |
![]() |
At MH shed, Angela packs No.2's water gauge handles, guarded by Dave |