| Steve & Ian setting up a former |
![]() |
| Steve & Rob installing a fibre joint |
![]() |
| Ian levelling the surface of the bay platform |
![]() |
| Ian using the blade, Rob & Steve doing the finer levelling |
![]() |
| I'm flattening & compressing the material |
![]() |
| Concrete has arrived |
![]() |
| Ian, Steve & Rob shovelling ..... |
![]() |
| ..... to fill the former |
![]() |
| Ian levelling, Rob using the vibrating poker |
![]() |
| Final levelling |
![]() |
| Steve washing out the dumper bucket |
![]() |
| A track has come off the digger ..... |
![]() |
| ..... but with judicious use of bars ..... |
![]() |
| ..... it's back on |
![]() |
| Loading sleepers for removal from the work site |
![]() |
| As of today, the bay platform road is clear & the surface is usable |