![]() |
| Ian taking delivery of a new drilling machine |
![]() |
| Using the crane to offload the 4 ton device |
![]() |
| Meanwhile, Aiden & Bill are fixing a bogie ..... |
![]() |
| ..... to be pushed into place ..... |
![]() |
| ..... so that Bill can load the drill ..... |
![]() |
| ..... for bowling into the shed |
![]() |
| Peter is quite pleased with the new acquisition - it can be used to drill boilers & frames at any angle & in many more positions than a magnetic drill |
![]() |
| Back to track - Bill, Rob & Steve splitting a 1 in 5 crossing which needs repair |
![]() |
| Rob, Dave & Aiden barring sections apart |
![]() |
| Ian checking Steve's bending of a blade for the reassembled A switch |
![]() |
| Using a crow to bend slightly beyond straight, to allow for springing back |
![]() |
| Steve & Dave replacing the straightened blade |
![]() |
| Steve now bends a replacement section of the 1 in 5 crossing |













No comments:
Post a Comment