Ian taking delivery of a new drilling machine |
Using the crane to offload the 4 ton device |
Meanwhile, Aiden & Bill are fixing a bogie ..... |
..... to be pushed into place ..... |
..... so that Bill can load the drill ..... |
..... for bowling into the shed |
Peter is quite pleased with the new acquisition - it can be used to drill boilers & frames at any angle & in many more positions than a magnetic drill |
Back to track - Bill, Rob & Steve splitting a 1 in 5 crossing which needs repair |
Rob, Dave & Aiden barring sections apart |
Ian checking Steve's bending of a blade for the reassembled A switch |
Using a crow to bend slightly beyond straight, to allow for springing back |
Steve & Dave replacing the straightened blade |
Steve now bends a replacement section of the 1 in 5 crossing |