At East Tanfield

Nigel removing fencing .....
..... with assistance of Ian & the digger
(in preparation for platform surface & water tower work)
I'm preparing a door to be lifted ......
(photo courtesy of Nigel Wheeler)
..... & laid flat, so that Bill & Steve can fully fix sheeting to the frame
Nigel & Steve fitting a closure piece
Dave extending wiring in the station building .....
..... for fitting hand driers in the toilets
Ian altering surfacing in the car park to improve drainage
Lifting off the other large door .....
.... in order to fully attach the sheeting to the frame
Steve steering the door ......
...... back into position
Meanwhile Geoff has been painting fencing at AH
(photo courtesy of Geoff Lowe)