Nigel removing fencing ..... |
..... with assistance of Ian & the digger (in preparation for platform surface & water tower work) |
I'm preparing a door to be lifted ...... (photo courtesy of Nigel Wheeler) |
..... & laid flat, so that Bill & Steve can fully fix sheeting to the frame |
Nigel & Steve fitting a closure piece |
Dave extending wiring in the station building ..... |
..... for fitting hand driers in the toilets |
Ian altering surfacing in the car park to improve drainage |
Lifting off the other large door ..... |
.... in order to fully attach the sheeting to the frame |
Steve steering the door ...... |
...... back into position |
Meanwhile Geoff has been painting fencing at AH (photo courtesy of Geoff Lowe) |