| Geoff, Steve, Colin, George ...... |
![]() |
| ..... & Bill digging out round the station, for block paving soon |
![]() |
| Steve & Colin removing fencing from the site for the water tank |
![]() |
| Ian welding the extension for one leg of the water tank frame |
![]() |
| Geoff painting the frame..... |
![]() |
| ..... which is then lifted into place |
![]() |
| George welding the extension to the leg |
![]() |
| Washing out the mixer after concreting round the legs |
![]() |
| Geoff painting the tank |
![]() |
| Dave wiring in the hand driers |
![]() |
| Bill & Steve, assisted by Kevin on the ground ..... |
![]() |
| ..... fitting cladding around the main doorway - the sleeper pad is for fork lift access |