Geoff, Steve, Colin, George ...... |
![]() |
..... & Bill digging out round the station, for block paving soon |
![]() |
Steve & Colin removing fencing from the site for the water tank |
![]() |
Ian welding the extension for one leg of the water tank frame |
![]() |
Geoff painting the frame..... |
![]() |
..... which is then lifted into place |
![]() |
George welding the extension to the leg |
![]() |
Washing out the mixer after concreting round the legs |
![]() |
Geoff painting the tank |
![]() |
Dave wiring in the hand driers |
![]() |
Bill & Steve, assisted by Kevin on the ground ..... |
![]() |
..... fitting cladding around the main doorway - the sleeper pad is for fork lift access |