Loading a ground signal at Marley Hill ..... |
..... & signal wire posts |
Works train heading for East Tanfield |
Reloading a signal post |
Kevin cutting back foliage |
Digging a hole for the first signal post |
Attaching a board to the post |
Using the digger to lift the post ..... |
..... & lower it into the 5' hole |
Backfilling |
Tidying the batter & cess ..... |
..... so that Rob & Steve can plant the signal wire posts |
Colin & Ian setting what will be a direction indicator |
Ballast waggon ready for use on the new siding |