![]() |
Kevin, Dave & Steve packing ballast at sleeper ends after we've slewed the crossing |
![]() |
We've aligned the point to the loop, so ballasting the ends of sleepers to keep it in place |
![]() |
Kevin removing a fishplate bolt as we slew the curved closure into place |
![]() |
More jacking by Cameron & Kevin |
![]() |
Steve, Kevin & Cameron ballasting sleeper ends |
![]() |
Barring another rail down |
![]() |
Ian cutting the rail to length |
![]() |
Barring the rail, which has a better section than the previous one, into the chairs |
![]() |
Colin drilling for fishplating |
![]() |
Dave removing another rail, now considered too worn, out of the chairs |
![]() |
Colin cutting the replacement |
![]() |
Now connected & aligned, but in need of packing, etc |
No comments:
Post a Comment