Back to Sunniside

Kevin, Dave & Steve packing ballast at sleeper ends after we've slewed the crossing
We've aligned the point to the loop, so ballasting the ends of sleepers to keep it in place
Kevin removing a fishplate bolt as we slew the curved closure into place
More jacking by Cameron & Kevin
Steve, Kevin & Cameron ballasting sleeper ends
Barring another rail down
Ian cutting the rail to length
Barring the rail, which has a better section than the previous one, into the chairs
Colin drilling for fishplating
Dave removing another rail, now considered too worn, out of the chairs
Colin cutting the replacement
Now connected & aligned, but in need of packing, etc