Geoff painting Boyd's farm gates (photo courtesy of Geoff Lowe) |
![]() |
Steve oiling the crane's axleboxes (photo courtesy of Dave Dixon) |
![]() |
Colin greasing the crane's slewing ring rollers (photo courtesy of Dave Dixon) |
![]() |
Dave at the controls of the Armstrong No.2 ...... |
![]() |
...... following the crane to Sunniside, where it will assist with positioning & braking |
![]() |
Ian has lowered the jib as the crane enters Sunniside |
![]() |
I'm slinging the switch panel on the waggon (photo courtesy of Dave Dixon) |
![]() |
Steve & Colin controlling the middle section as it comes off the waggon ..... |
![]() |
.... to be stacked on the switch ..... (photo courtesy of Geoff Lowe) |
![]() |
..... & unslung (photo courtesy of Geoff Lowe) |
![]() |
Cameron controlling one end of the crossing ..... |
![]() |
...... as it's taken over the first two parts to be placed in its final position (photo courtesy of Geoff Lowe) |
![]() |
The mid section is at the limit of the crane's reach |
![]() |
Dave jacking the section into position |
![]() |
Cameron & Steve fishplating the sections together |
![]() |
We're setting down the switch section on top ..... |
![]() |
..... & leaving it to be positioned later, using the digger |