Forming AH footbridge - positioning a 14 x 14 header on 14 x 14 columns (Peter on left, Ian & Derek in front, Mick operating the Beamish crane) |
Ian, Mick, Derek & Alan Wiltshire discuss railway materials & work |
Positioning the first cross member, using ropes to brace & control |
PS There are more shots of the Beamish crane at work, including on this AH footbridge job, in a previous post.
No comments:
Post a Comment