![]() |
| Dennis cutting a manhole extension, assisted by Cameron |
![]() |
| Terry & Cameron installing a sealing ring |
![]() |
| Removing a concrete slab ..... |
![]() |
| ..... for Steve to cart away |
![]() |
| Terry compacting around the manhole |
![]() |
| Cameron realigning steps while Dennis concretes the manhole cover in place |
![]() |
| Jim setting up HC 38's piston in the Crowthorn lathe |
![]() |
| Mick seeing to the saw |
![]() |
| Another manhole being installed |
![]() |
| Steve shovelling pipe bedding around the manhole |
![]() |
| Ian reinstating the route around the woodwork workshop |
![]() |
| Steve installing a pipe coupling |
![]() |
| Ian tidying up |













No comments:
Post a Comment