![]() |
| Mick working on HC 38's Wakefield lubricator |
![]() |
| Dennis making gussets |
![]() |
| Peter degreasing Horden's valve chest covers ready for painting |
![]() |
| An inspector from Frazer Nash NDT checking HC 38's boiler ..... |
![]() |
| ..... & in discussion with David |
![]() |
| Cameron shovelling pipe bedding for spreading the whole length of the pipe |
![]() |
| Steve & Dennis uncovering the water feeds to the shed & from the tank |
![]() |
| Ian continuing to clear a channel for the pipe |
![]() |
| Steve removing excess fill |
![]() |
| Dennis & Steve placing the last full length of pipe |
![]() |
| Steve & Dennis waiting for me to pour pipe bedding around the pipe (photo courtesy of Ian Cowan) |
![]() |
| The pipe end has been aligned with the existing channel; Cameron & Steve spread bedding |
![]() |
| Removing excess fill |













No comments:
Post a Comment