Mick working on HC 38's Wakefield lubricator |
Dennis making gussets |
Peter degreasing Horden's valve chest covers ready for painting |
An inspector from Frazer Nash NDT checking HC 38's boiler ..... |
..... & in discussion with David |
Cameron shovelling pipe bedding for spreading the whole length of the pipe |
Steve & Dennis uncovering the water feeds to the shed & from the tank |
Ian continuing to clear a channel for the pipe |
Steve removing excess fill |
Dennis & Steve placing the last full length of pipe |
Steve & Dennis waiting for me to pour pipe bedding around the pipe (photo courtesy of Ian Cowan) |
The pipe end has been aligned with the existing channel; Cameron & Steve spread bedding |
Removing excess fill |
No comments:
Post a Comment