Geoff & Bill priming a window frame |
Bill painting a lamp ost at Andrews House (photo courtesy of Geoff Lowe) |
Dave building more of the wall above the replaced window arch in MH shed |
Dennis mixing mortar ..... |
..... & delivering to Dave |
Dave building up the inside wall |
Cameron drilling frame fixing lugs ..... |
..... & helping Ian to set out a frame for welding |
Ian dressing off following welding |
Another frame being primed |
Sarah working on Cochrane's repaint |
Dave removing brick fillers from a window arch |
Dennis removing rubble from a doorway he's removing (to be rebuilt as a window) |
Removing the lintel (the lower wall needs rebuilding) |
Dennis guiding a window frame (photo courtesy of Dave Dixon) |
The frame going into place (photo courtesy of Dave Dixon) |
No comments:
Post a Comment