I'm fitting another purlin (photo courtesy of Geoff Lowe) |
Purlins being prepared for use |
Colin & Dave cutting, covering & treating purlins to fit the gable |
Ian cutting new purlins to length (photo courtesy of Dave Dixon) |
Colin wrapping ends to reduce rot (photo courtesy of Dave Dixon) |
Colin & Dave at work |
Ian fitting one of the prepared purlins |
Terry puttying shed windows |
I'm puzzling how to weave the last purlin into place in a section (photo courtesy of Dave Dixon) |
Ian fitting a purlin |
The scene from below (photo courtesy of Dave Dixon) |
Tightening fixings |
Colin & Dave loading a purlin |
Barry painting No.4 signal at Andrews House ..... (photo courtesy of Geoff \Lowe) |
.... & No.5 signal - the other southbound starter at AH (photo courtesy of Geoff \Lowe) |
Geoff alongside Barry, preparing more of No.4 for paint (photo courtesy of Geoff \Lowe) |
Ian & Colin sawing timber ..... (photo courtesy of Dave Dixon) |
..... with which to make supports for the ridge of MH shed (photo courtesy of Dave Dixon) |
Ian cementing the top of the gable & purlin ends |
Dennis cleaning the mixer after use |
At the end of today, all purlins are in place, but need work at the gable end |
No comments:
Post a Comment