![]() |
| Ben on 49 heading out of Marley Hill to pick up the train at East Tanfield |
![]() |
| Andy cutting bar for the water tower works |
![]() |
| Steve machining a coupling flange |
![]() |
| Jim turning bar for water tower controls |
![]() |
| Tom setting up the miller for No.6's safety valves |
![]() |
| Brian cutting out another flange for the water tower works |
![]() |
| Logan training on 49 |
![]() |
| Richard watching 49's arrival at Andrews House |
![]() |
| Andy machining bar for water tower controls |
![]() |
| Chris setting up an extractor fan |
![]() |
| Tom heating a tube end in HL No.2's smokebox |
![]() |
| In No.2's firebox, Chris hammering a mandrel to knock a tube out |
![]() |
| Extracting a tube - a few dozen more to go |
![]() |
| Dan attacking a rough part of the welcome hut picnic area |














No comments:
Post a Comment