| Dave & Dave moving a chute down the shed - a fairly tight fit under the trusses |
| Ian & Ian installing the collar through the roof sheets (photo courtesy of Angela Pickering) |
![]() |
| Dave guiding the lift as Dave & Barry steer the tube through the collar |
![]() |
| The view from the Andrews House branch as ..... |
| ..... flashing sheets are installed (photo courtesy of Angela Pickering) |
| Diassembling the top in order to move the access tower |
![]() |
| Dave & Barry cutting short chute extensions |
![]() |
| Angela cleaning threads on a sealing collar |
![]() |
| Hat installation & ...... |
![]() |
| ..... the view along the SE roof pitch |
![]() |
| Caption competition? |
![]() |
| Dave & Barry screwing sections together |
![]() |
| More collaring ..... |
![]() |
| ..... & assembly - the joints are a tight fit |
![]() |
| The main tube is standard spiral ducting, all other components are bespoke (photo courtesy of Angela Pickering) |
![]() |
| Express collar delivery ..... |
![]() |
| ..... for the other side of the roof |
![]() |
| Fitting another chute in place inside the shed |
| Preparing the way to lift the last chute assembly through the collar & roof (photo courtesy of Angela Pickering) |
| Barry & Dave on the tower, Ian guiding me on the forklift (photo courtesy of Angela Pickering) |
| Slow, steady, guided progress (photo courtesy of Angela Pickering) |
| Vertical supports are hooked bars under the skirt, stayed to purlins, augmented by clamping to horizontal stays (photo courtesy of Angela Pickering) |
![]() |
| Barry & Dave clamping |
| The six chutes in place, pending final alignment & repainting inside the shed, plus staying capping, flashing, sealing & repainting outside (photo courtesy of Angela Pickering) |
Info: MH shed door lintels 13'8", chutes 13'3", austerity chimney 12'2" approx above rail