Geoff & Colin fixing cladding on East Tanfield station
Bill, Dave & Geoff moving a concrete beam to allow the dumper through
Dave & Ian doing final set up of the concrete formers for the platform copings
Concrete delivery
Bill, Ian & Dave shovelling concrete into the first former
Geoff waiting to use the electric vibrator to remove air from the concrete
Filling the second former
Using some of the spare concrete .....
..... to complete a foundation for an internal platform support pier
Levelling the foundation
Casting the corner of the outside walkway
Levelling off
Bill, Colin & I marking the correct centre for the track relative to the side of the shed
(photo courtesy of Dave Dixon)
Craning the muscleman onto the carriage shed road
Aligning the track laterally .....
..... & vertically
Dave & Bill roughly packing the lead into the shed .....
..... assisted by Colin
Realigning a few sleepers
Attending to a minor misalignment in the shed
Loading the temporary runway rails for removal from the shed