| Geoff & Colin fixing cladding on East Tanfield station |
![]() |
| Bill, Dave & Geoff moving a concrete beam to allow the dumper through |
![]() |
| Dave & Ian doing final set up of the concrete formers for the platform copings |
![]() |
| Concrete delivery |
![]() |
| Bill, Ian & Dave shovelling concrete into the first former |
![]() |
| Geoff waiting to use the electric vibrator to remove air from the concrete |
![]() |
| Filling the second former |
![]() |
| Using some of the spare concrete ..... |
![]() |
| ..... to complete a foundation for an internal platform support pier |
![]() |
| Levelling the foundation |
![]() |
| Casting the corner of the outside walkway |
![]() |
| Levelling off |
| Bill, Colin & I marking the correct centre for the track relative to the side of the shed (photo courtesy of Dave Dixon) |
![]() |
| Craning the muscleman onto the carriage shed road |
![]() |
| Aligning the track laterally ..... |
![]() |
| ..... & vertically |
![]() |
| Dave & Bill roughly packing the lead into the shed ..... |
![]() |
| ..... assisted by Colin |
![]() |
| Realigning a few sleepers |
![]() |
| Attending to a minor misalignment in the shed |
![]() |
| Loading the temporary runway rails for removal from the shed |