Geoff & Colin fixing cladding on East Tanfield station |
Bill, Dave & Geoff moving a concrete beam to allow the dumper through |
Dave & Ian doing final set up of the concrete formers for the platform copings |
Concrete delivery |
Bill, Ian & Dave shovelling concrete into the first former |
Geoff waiting to use the electric vibrator to remove air from the concrete |
Filling the second former |
Using some of the spare concrete ..... |
..... to complete a foundation for an internal platform support pier |
Levelling the foundation |
Casting the corner of the outside walkway |
Levelling off |
Bill, Colin & I marking the correct centre for the track relative to the side of the shed (photo courtesy of Dave Dixon) |
Craning the muscleman onto the carriage shed road |
Aligning the track laterally ..... |
..... & vertically |
Dave & Bill roughly packing the lead into the shed ..... |
..... assisted by Colin |
Realigning a few sleepers |
Attending to a minor misalignment in the shed |
Loading the temporary runway rails for removal from the shed |