Mysterio removing loose brick & plaster from the eaves |
![]() |
Steve clearing up the debris, including bird droppings |
![]() |
Ian adding ridge pieces |
![]() |
David & Tom in discussion with Jim over HC 38's axlebox work |
![]() |
Dave tidying up wiring |
![]() |
Dave, Mysterio & Steve working on the wall |
![]() |
Another temporary ridge purlin going in |
![]() |
Geoff sealing wallboard |
![]() |
JIm & David checking the run out when setting up an axlebox on the miller |
![]() |
Mick & Steve tidying the shed |
![]() |
Steve wiring the Fowler |
![]() |
Geoff undercoating |
![]() |
MIck straightening sheets for use on the ridge |
![]() |
Still clearing the eaves |
![]() |
Ian sweeping up |
![]() |
Steve doing detail work |