Roof Work

Steve & Dave holding a sheet up while Ian checks the alignment
Fastening the sheet to the purlins
(photo courtesy of Dave Dixon)
The screws seal onto the top of the sine wave
There are about 36 screws to a 7m sheet, excluding the ridge
(photo courtesy of Dave Dixon)
The replacement cherry picker enables reaching over the steep pitch of the side rooms in this area
(photo courtesy of Dave Dixon)
Ian joining in
(photo courtesy of Dave Dixon)
The sheets are lifted from inside the shed to reduce manual lifting & effect of wind
Another sheet being fastened
Meanwhile Barry is the ground crew .....
,,,,, tidying up .....
(photo courtesy of Dave Dixon)
..... including the pits
Steve, Barry & Dave lifting another sheet onto the cherry picker
Holding onto the sheet .....
..... until it starts to be screwed down (Ian is checking on the cherry picker repair)
That's the last sheet of the day on this section