![]() |
Terry putting the finishing touches to the hanging basket watering system at AH (photo courtesy of Geoff Lowe) |
![]() |
Colin preparing to do woodwork (photo courtesy of Geoff Lowe) |
![]() |
Geoff painting a door (photo courtesy of Geoff Lowe) |
![]() |
Dave on electrics (photo courtesy of Geoff Lowe) |
![]() |
Terry painting a threshold at AH (photo courtesy of Geoff Lowe) |
![]() |
Simon painting another (photo courtesy of Geoff Lowe) |
![]() |
Ian partly clearing the front of MH shed (photo courtesy of Dave Dixon) |
![]() |
Barry, Cameron & Dave fetching a roof sheet |
![]() |
Manoeuvring into place |
![]() |
Ian & Ian screwing down the sheet |
![]() |
Barry, Dave & Ian stripping a sheet from the other side of the shed |
![]() |
Cameron & Barry are the team clearing the ground (photo courtesy of Dave Dixon) |
![]() |
I'm unfastening a roof sheet (photo courtesy of Dave Dixon) |
![]() |
Ian working from the scaffold (photo courtesy of Dave Dixon) |
![]() |
Another sheet being unfastened ..... |
![]() |
..... & being removed to the ground team ..... |
![]() |
..... then more being unfastened |
![]() |
Me, Ian, Ian & Dave (out of shot) removing different levels ..... (photo courtesy of Dave Dixon) |
![]() |
..... leaving the open frame of the shed roof (photo courtesy of Dave Dixon) |
![]() |
Ian loosening the uppermost fixings |
![]() |
The last few sheets being removed |
![]() |
Dave & Ian wrapping the end of the ridge piece which is to be mortared into the gable |
![]() |
Trying the ridge piece & realising that it is much too short (photo courtesy of Geoff Lowe) |
![]() |
Attaching the ridge support to the purlins ..... (photo courtesy of Dave Dixon) |
![]() |
..... & ensuring everything is tight |
![]() |
Removing temporary ridge supports (photo courtesy of Dave Dixon) |
![]() |
The southern face of the roof ready for resheeting (photo courtesy of Dave Dixon) |
No comments:
Post a Comment