| Terry putting the finishing touches to the hanging basket watering system at AH (photo courtesy of Geoff Lowe) |
![]() |
| Colin preparing to do woodwork (photo courtesy of Geoff Lowe) |
![]() |
| Geoff painting a door (photo courtesy of Geoff Lowe) |
![]() |
| Dave on electrics (photo courtesy of Geoff Lowe) |
![]() |
| Terry painting a threshold at AH (photo courtesy of Geoff Lowe) |
![]() |
| Simon painting another (photo courtesy of Geoff Lowe) |
![]() |
| Ian partly clearing the front of MH shed (photo courtesy of Dave Dixon) |
![]() |
| Barry, Cameron & Dave fetching a roof sheet |
![]() |
| Manoeuvring into place |
![]() |
| Ian & Ian screwing down the sheet |
![]() |
| Barry, Dave & Ian stripping a sheet from the other side of the shed |
![]() |
| Cameron & Barry are the team clearing the ground (photo courtesy of Dave Dixon) |
![]() |
| I'm unfastening a roof sheet (photo courtesy of Dave Dixon) |
![]() |
| Ian working from the scaffold (photo courtesy of Dave Dixon) |
![]() |
| Another sheet being unfastened ..... |
![]() |
| ..... & being removed to the ground team ..... |
![]() |
| ..... then more being unfastened |
![]() |
| Me, Ian, Ian & Dave (out of shot) removing different levels ..... (photo courtesy of Dave Dixon) |
![]() |
| ..... leaving the open frame of the shed roof (photo courtesy of Dave Dixon) |
![]() |
| Ian loosening the uppermost fixings |
![]() |
| The last few sheets being removed |
![]() |
| Dave & Ian wrapping the end of the ridge piece which is to be mortared into the gable |
![]() |
| Trying the ridge piece & realising that it is much too short (photo courtesy of Geoff Lowe) |
![]() |
| Attaching the ridge support to the purlins ..... (photo courtesy of Dave Dixon) |
![]() |
| ..... & ensuring everything is tight |
![]() |
| Removing temporary ridge supports (photo courtesy of Dave Dixon) |
![]() |
| The southern face of the roof ready for resheeting (photo courtesy of Dave Dixon) |