![]() |
| Cameron preparing the way for another roof sheet on MH shed |
![]() |
| Ian removing the old roof sheets |
![]() |
| The last roof sheet on this side slung under the cherry picker basket |
![]() |
| Positioning the sheet for cutting around the chimney |
![]() |
| Fastening down the sheet |
![]() |
| The sheet on the other side being lifted up the roof |
![]() |
| Steve fastening down the sheet |
![]() |
| Dave trimming the sheet to suit |
![]() |
| At Andrews House, Bob unpacking a new refrigerator |
![]() |
| Dave fitting a new switch |
![]() |
| Terry painting walls |
![]() |
| Dave sealing sheet to water table |
![]() |
| The roof is becoming more water tight |














No comments:
Post a Comment