![]() |
| George compacting the sand base for block paving at East Tanfield |
![]() |
| Kevin & Steve fetching blocks; George, Colin & Nigel laying them |
![]() |
| The blocks are advancing; Colin is brushing dry sand into the joints |
![]() |
| Colin now vibrates the blocks to seat them, as George continues to fill the joints |
![]() |
| Kevin supplying blocks |
![]() |
| Still advancing |
![]() |
| George compacting more sand which Ian has been levelling |
![]() |
| The team continue |
![]() |
| Nearing the end of laying for today |
![]() |
| Ian & Steve are extending a manhole cover so that it will be level with the blocks |
![]() |
| Bringing pallets of blocks ready for tomorrow |
![]() |
| Steve laying the last for today |
![]() |
| Ian digging to enable the blocks to be laid as far as the start of the bay, from where the original surface will stay |













No comments:
Post a Comment