| Colin & Geoff starting work to lift a drain cover by about 100 mm |
![]() |
| Ian cutting into concrete around the manhole, to weaken its grip (photo courtesy of Geoff Lowe) |
![]() |
| Geoff taking the preceding photo |
![]() |
| I'm cutting into the door frame ..... (photo courtesy of Geoff Lowe) |
![]() |
| ...... so that Ian can weld a lock in place |
![]() |
| Colin helping to change the bucket on the digger |
![]() |
| The digger has been used to lift out the drain cover & shaft, which was surrounded by about half a tonne of concrete |
![]() |
| Colin breaking off the concrete |
![]() |
| Cutting the drain shaft extension, which will raise the cover |
![]() |
| The drain cover is now at the same height as the path & being back filled around |
![]() |
| Digging a pit for a short sleeper wall |