Steve & Dave extending ET platform beyond the water column ..... |
..... with Bill mixing for them |
* |
Colin ..... |
..... & Kevin spreading bedding for further flagstones |
Ian digging out between buildings for a wide access path |
Colin clearing the edge |
Kevin clearing another side of the building |
The stub wall nearly complete - another coping required for crew use |
Ian consolidating the bed between buildings |
Works train with 7 tonnes of flagstones bound for ET |
Offloading ..... |
..... & stockpiling |
Delivering a pallet weighing about a tonne to the work site |
Colin chipping off old mortar |
Dave adding bedding |
Kevin passing the gate key on return |