Steve & Dave extending ET platform beyond the water column ..... |
![]() |
..... with Bill mixing for them |
*![]() |
Colin ..... |
![]() |
..... & Kevin spreading bedding for further flagstones |
![]() |
Ian digging out between buildings for a wide access path |
![]() |
Colin clearing the edge |
![]() |
Kevin clearing another side of the building |
![]() |
The stub wall nearly complete - another coping required for crew use |
![]() |
Ian consolidating the bed between buildings |
![]() |
Works train with 7 tonnes of flagstones bound for ET |
![]() |
Offloading ..... |
![]() |
..... & stockpiling |
![]() |
Delivering a pallet weighing about a tonne to the work site |
![]() |
Colin chipping off old mortar |
![]() |
Dave adding bedding |
![]() |
Kevin passing the gate key on return |