Uncovering a rainwater duct |
![]() |
..... and dropping it to form a soak away |
![]() |
Steve tidying up |
![]() |
David & David deliver the switch for the offloading siding |
![]() |
Paving between the buildings had been undermined - Steve & Bill dig to install a field drain |
![]() |
Nigel removing a wire nest from his prop shaft |
![]() |
More loading of ballast ..... |
![]() |
..... with which George covers the field drain |
![]() |
Compacting a sand bed |
![]() |
Nigel levelling off the bed ..... |
![]() |
..... as the paving slabs are replaced |
![]() |
Swapping buckets before tidying uo |