Ian scraping the slime from part of ET car park ..... |
![]() |
...... & loading ballast to replace the cover |
![]() |
Steve, George & Bill disconnecting track panels in ET headshunt |
![]() |
Ian, Jason & Steve clearing another set of fishplates to be unfastened |
![]() |
George & Kevin undoing plates - the crossing nose alongside needs to be installed |
![]() |
Bill, Kevin & Steve packing a joint in the bay platform |
![]() |
Dropping the jacks after packing |
![]() |
Digging to install a soakaway in front of the station entrance |
![]() |
Loading the dumper ...... |
![]() |
..... for Geoff to unload |
![]() |
Steve carefully exposing the drain pipe ..... |
![]() |
..... into which Bill cuts slots to better take away surface water |
![]() |
Loading more ballast ...... |
![]() |
..... which is used to fill the trench - George, Ian & Steve levelling |
![]() |
Geoff dropping his last load |
![]() |
The soakaway should improve drainage in front of the station |
![]() |
Ian levelling off the ballast cover |