Wednesday, 19 December 2018

Track & Field Drain

Ian scraping the slime from part of ET car park .....
...... & loading ballast to replace the cover
Steve, George & Bill disconnecting track panels in ET headshunt
Ian, Jason & Steve clearing another set of fishplates to be unfastened
George & Kevin undoing plates - the crossing nose alongside needs to be installed
Bill, Kevin & Steve packing a joint in the bay platform
Dropping the jacks after packing
Digging to install a soakaway in front of the station entrance
Loading the dumper ......
..... for Geoff to unload
Steve carefully exposing the drain pipe .....
..... into which Bill cuts slots to better take away surface water
Loading more ballast ......
..... which is used to fill the trench - George, Ian & Steve levelling
Geoff dropping his last load
The soakaway should improve drainage in front of the station
Ian levelling off the ballast cover