Search this blog

Thursday, 13 December 2018

Today's Jobs

Peter continuing the needle gunning of Horden's tank
Making a retaining bolt for a spring buckle
Rob recabling a drill
Clearing a waggon
(photos courtesy of Dave Dixon)

Loading sleepers as a base
(photos courtesy of Dave Dixon)

Loading a short panel to enable the rest to clear the fixed upright ends
Loading the first 40' 90 lb/yd panel - each weighs about 3.5 tonnes
(photo courtesy of Dave Dixon)
Dave slinging another panel
Each panel needs to be rotated to get round the crane
A sleeper is missing from this panel
Dave waiting to take hold of & control a panel
Aligning with the waggon
Dave removing chains
The first load of panels on their way to ET, to make the new offloading siding
-  they were previously in our line north of Terrace Junction

No comments: