Ian digging out the end of the excavation for ET offloading siding ..... |
![]() |
..... & dropping ballast into the hole |
![]() |
George drilling a rail end |
![]() |
Bill & Ian placing temporary rails ...... |
![]() |
..... as a runway for the bogie |
![]() |
Ian, Bill, George & Steve moving the rails to gauge ...... |
![]() |
...... up to the end of the siding |
![]() |
First panel being loaded onto the bogie ...... |
![]() |
..... to be trundled up to the temporary rails ...... |
![]() |
..... then pushed with the digger attached as a brake |
![]() |
The bogie has run off the end of the temporary rails |
![]() |
Dave watching the bogie being pushed out from under the track panel |
![]() |
A couple of the temporary rails are being pulled out |
![]() |
Next panel being slung ..... |
![]() |
..... & loaded onto the bogie ..... |
![]() |
..... then pushed along to its place |
![]() |
Ian lifting one end to enable extraction of the bogie |
![]() |
Again, the temporary runway rails are removed |
![]() |
Ian & Steve guiding the third & final panel ...... |
![]() |
..... then everyone joins in to place it on the bogie |
![]() |
Dave leading the push |
![]() |
Ian aligning the last panel |
![]() |
Bill, George & Dave fishplating |
![]() |
All hands on the next pair of joints |
![]() |
Using the digger to improve alignment ..... |
![]() |
..... with guidance from Nigel |
![]() |
Ian & Steve reattaching a sleeper which had come loose in transit |
![]() |
Ian derailing the bogie for safety |