Ian digging out the end of the excavation for ET offloading siding ..... |
..... & dropping ballast into the hole |
George drilling a rail end |
Bill & Ian placing temporary rails ...... |
..... as a runway for the bogie |
Ian, Bill, George & Steve moving the rails to gauge ...... |
...... up to the end of the siding |
First panel being loaded onto the bogie ...... |
..... to be trundled up to the temporary rails ...... |
..... then pushed with the digger attached as a brake |
The bogie has run off the end of the temporary rails |
Dave watching the bogie being pushed out from under the track panel |
A couple of the temporary rails are being pulled out |
Next panel being slung ..... |
..... & loaded onto the bogie ..... |
..... then pushed along to its place |
Ian lifting one end to enable extraction of the bogie |
Again, the temporary runway rails are removed |
Ian & Steve guiding the third & final panel ...... |
..... then everyone joins in to place it on the bogie |
Dave leading the push |
Ian aligning the last panel |
Bill, George & Dave fishplating |
All hands on the next pair of joints |
Using the digger to improve alignment ..... |
..... with guidance from Nigel |
Ian & Steve reattaching a sleeper which had come loose in transit |
Ian derailing the bogie for safety |