Dave installing a gate catch (photo courtesy of Geoff Lowe) |
First panel of the day being offloaded |
Steve watching carefully as the crane runs back with the panel |
Bill on the steering rope |
Bill, Ian & Steve setting the panel in position |
Kevin clearing the bankside of the headshunt |
Cameron & Trevor lopping overhanging limbs |
Dennis laying the cuttings behind the fence |
Bill swinging another panel ..... |
....to run back ..... |
..... & set down |
Nigel & Geoff inspecting sleepers for the buffer stop |
Dave giving a hand to fix the first in place ..... |
..... & the second - ready for painting |
The headshunt switch to the offloading siding is in place |
Picking up the 85lb/yd FB panels removed yesterday |
Ian in control |
Ian in the driving seat |
Ian, Bill & Steve stacking the FB panels - to be placed later |
Unloading the flail for later use |
The last short panel of 90lb/yd BH being slung ..... |
..... & dropped |