![]() |
Dave installing a gate catch (photo courtesy of Geoff Lowe) |
![]() |
First panel of the day being offloaded |
![]() |
Steve watching carefully as the crane runs back with the panel |
![]() |
Bill on the steering rope |
![]() |
Bill, Ian & Steve setting the panel in position |
![]() |
Kevin clearing the bankside of the headshunt |
![]() |
Cameron & Trevor lopping overhanging limbs |
![]() |
Dennis laying the cuttings behind the fence |
![]() |
Bill swinging another panel ..... |
![]() |
....to run back ..... |
![]() |
..... & set down |
![]() |
Nigel & Geoff inspecting sleepers for the buffer stop |
![]() |
Dave giving a hand to fix the first in place ..... |
![]() |
..... & the second - ready for painting |
![]() |
The headshunt switch to the offloading siding is in place |
![]() |
Picking up the 85lb/yd FB panels removed yesterday |
![]() |
Ian in control |
![]() |
Ian in the driving seat |
![]() |
Ian, Bill & Steve stacking the FB panels - to be placed later |
![]() |
Unloading the flail for later use |
![]() |
The last short panel of 90lb/yd BH being slung ..... |
![]() |
..... & dropped |
No comments:
Post a Comment