Ian loading the new digger onto the 8wheel rail vehicle bound for East Tanfield |
Arriving at East Tanfield |
Off loading at ET |
Colin and Steve unloading the whacker plate. |
Colin and Steve mounting a crank pivot base |
Colin drilling holes for mounting bolts |
Dave and Steve tightening crank pivot bolts. |
I am backfilling the off loading siding. |
Steve,Dave and Colin deciding where to place the crank base. |