| Ian loading the new digger onto the 8wheel rail vehicle bound for East Tanfield |
![]() |
| Arriving at East Tanfield |
| Off loading at ET |
| Colin and Steve unloading the whacker plate. |
| Colin and Steve mounting a crank pivot base |
| Colin drilling holes for mounting bolts |
| Dave and Steve tightening crank pivot bolts. |
| I am backfilling the off loading siding. |
![]() |
| Steve,Dave and Colin deciding where to place the crank base. |

