![]() |
| Ian, Angela (driving) & Brian as the Armstrong prepares to leave for Causey to do clearing work for the Waggonway |
![]() |
| Paul marking out new valves for drilling prior to fitting on Twizell |
![]() |
| Eric with a powered wire wheel preparing a pull rod for 38 |
![]() |
| Jim machining a special bolt for Twizell |
![]() |
| Tom cutting the reversing reach rod on 38 prior to re-machining & adjusting its length |
![]() |
| Tom milling a bracket for 38 |
![]() |
| 35 shunting Twizell to go into the carriage shed for painting |
The photos above are courtesy of Peter Weightman







No comments:
Post a Comment