Ian taking delivery of concrete ..... |
![]() |
...... & balancing his way ..... |
![]() |
..... to the first shutter, where Steve & John shovel |
![]() |
John consolidating & removing air with his poker |
![]() |
Adding steel reinforcement mesh to the upstand |
![]() |
John vibrating for a food finish to the front |
![]() |
Steve tidying the top shutter |
![]() |
Ian levelling ..... |
![]() |
..... & finishing the top surface |
![]() |
Washing out the dumper |
![]() |
Steve cutting mesh for the more platform pours ..... |
![]() |
..... & burying ducting for a water pipe |
![]() |
Later, slackening off the shuttering once the concrete has started to set |
![]() |
Back at Marley Hill, Rob updating the PAT database following today's electrical inspections |