Geoff & Nigel painting signalbox shutters
(photo courtesy of Geoff Lowe)
![]() |
Geoff, Kevin & Nigel painting the container end which is to be made into a store |
![]() |
Jason, George, Cameron & Steve clearing up |
![]() |
Steve removing another dumper load of wood |
![]() |
Ian pressure washing a mower |
![]() |
Another PMV being lifted, one end at a time |
![]() |
Removing a tree that has grown up partially inside the PMV |
![]() |
Lifting the whole body, leaving behind the rotten floor & contents |
![]() |
George & Steve reslinging one side ..... |
![]() |
..... & Bill & Dave the other |
![]() |
Relifted, then steered by Steve & Ian .... |
![]() |
..... before being set down out of the way |
![]() |
Starting to clear the floor area of the PMV |
![]() |
Steve changing a wheel on the dumper |
No comments:
Post a Comment