Dave removing chair screws with the impact wrench |
Kevin & Colin unfastening the point motor / economic facing point lock |
Kevin removing a crank |
Removing more FPL fittings |
Steve fitting a temporary screw which Ian uses to draw out the timber |
Dave cutting off a fitting |
With timbers removed, Bill, Kevin & Steve clear loose ash from the bed |
Bill removing ferrules |
Steering replacement second hand hardwood timbers ..... |
..... as they are pushed in by Ian on the digger |
Some are more awkward to insert |
Ian measuring the left hand switch rail |
Kevin & Dave cleaning chairs as Rob & Steve move timbers to avoid existing holes |
Adjusting gaps to spec |
The left hand switch rail being lifted out |