| Dave removing chair screws with the impact wrench |
![]() |
| Kevin & Colin unfastening the point motor / economic facing point lock |
![]() |
| Kevin removing a crank |
![]() |
| Removing more FPL fittings |
![]() |
| Steve fitting a temporary screw which Ian uses to draw out the timber |
![]() |
| Dave cutting off a fitting |
![]() |
| With timbers removed, Bill, Kevin & Steve clear loose ash from the bed |
![]() |
| Bill removing ferrules |
![]() |
| Steering replacement second hand hardwood timbers ..... |
![]() |
| ..... as they are pushed in by Ian on the digger |
![]() |
| Some are more awkward to insert |
![]() |
| Ian measuring the left hand switch rail |
![]() |
| Kevin & Dave cleaning chairs as Rob & Steve move timbers to avoid existing holes |
![]() |
| Adjusting gaps to spec |
![]() |
| The left hand switch rail being lifted out |