| Dave & Steve aligning beams ready for marking ..... |
![]() |
| ..... & cutting by Ian |
![]() |
| Dave & Steve ..... |
![]() |
| ..... installing the joists between the steel beams |
![]() |
| Meanwhile Bill & Colin are marking for sawing ..... |
![]() |
| ..... & screwing down the floorboards at the platform front edge |
![]() |
| Ian cutting more joists |
![]() |
| Rob & Logan giving a hand to install them |
![]() |
| Nailing together a compound joist to support floorboards at the platform end |
![]() |
| More floorboards being delivered ...... |
![]() |
| .....& accepted by Steve & Dave |
![]() |
| Steve & Ian moving packs onto the joists for easier installation |
![]() |
| Floorboards being fastened down |
![]() |
| Cutting to length |
![]() |
| A relatively slow job because ..... (photo courtesy of Logan Pye) |
![]() |
| ...... the long joint tongues & grooves are difficult to keep in place due to natural flaws in the boards |