Jim using a dial gauge to check the run out before machining Horden's smokebox door rim |
Machining under way |
Alan drilling a bracket for Horden |
Dennis making short handrails for Horden |
Ben painting a pipework bracket for Horden |
Walter sorting out stocks of small Whitworth bolts |
Malcolm working on an oil atomiser for Twizell's main steam pipe to lubricate the valve chest (& hence cylinders) |
Angela fitting a pipe to deliver oil to No.2's LH lower slide bar & crosshead |
Making oil trimmings for No.2 |
Tom drilling a rubbing strip for van 111's sliding door |
No comments:
Post a Comment