Pushing the bogie with the platform beams into position ...... |
..... to be lifted off by the digger |
Kevin & Steve steering a beam (each over 12m long) |
Geoff & Kevin painting the bare surfaces |
Nigel cutting a beam to length ...... |
..... so that it exactly spans two bays between stanchions |
Ian fetching another beam; the dumpy has been used to measure relative heights for front stanchions |
Painting continues apace |
Steve hanging onto an offcut so that it won't drop & foul the blade |
Most of the beams are now in the shed |
Geoff & Kevin nearly finished |