| Pushing the bogie with the platform beams into position ...... |
![]() |
| ..... to be lifted off by the digger |
![]() |
| Kevin & Steve steering a beam (each over 12m long) |
![]() |
| Geoff & Kevin painting the bare surfaces |
![]() |
| Nigel cutting a beam to length ...... |
![]() |
| ..... so that it exactly spans two bays between stanchions |
![]() |
| Ian fetching another beam; the dumpy has been used to measure relative heights for front stanchions |
![]() |
| Painting continues apace |
![]() |
| Steve hanging onto an offcut so that it won't drop & foul the blade |
![]() |
| Most of the beams are now in the shed |
![]() |
| Geoff & Kevin nearly finished |