Bill drilling a beam end |
Dave & Kevin preparing metalwork |
Colin drilling another beam end |
Kevin dressing plate |
Bill, Colin & Dave starting to set up a beam |
Oliver clearing foundations |
Steve & Colin plating a joint |
Steve dressing legs ready for welding top & bottom plates |
Installing another beam |
Oliver & Rob plating two beams together |
Checking heights |
Altering the end of a beam for better fit |
I'm cutting a beam to length (photo courtesy of Dave Dixon) |
Ian getting ready ..... (photo courtesy of Dave Dixon) |
..... to tack a beam to a support leg |
2 comments:
There's potentially lots of storage space underneath that platform. Will the surface plates be hinged?
No, the platform surface will be fixed longitudinal T&G flooring on joists supported by wooden cross beams between the steel girders.
Post a Comment