George removing a protrusion from the entrance doorway cill
Dave & George opening up the exit doorway for further work .....
..... & the main doorway
Nigel cutting slabs for the main foot entrance
Steve & Kevin bringing the floorboards towards the entrance
Bill sawing further along .....
..... to enable Kevin & Steve to advance behind
Ian checking an anomaly
Bill realizing this is a lengthy task 
Dave & Nigel pause to think & discuss .....
...... before continuing with saw, hammer & drill
George & Steve forming the level entrance
I'm preparing to be interviewed on film by a community group
(photo courtesy of Ian Cowan)
Bill fixing a board under compression by Ian
Steve removing kindling at the end of the day