E9 waiting by the coal washer, a long-gone coastal landmark |
E9 was the Erskine Road bank loco, redundant since a conveyor was installed |
Parnaby's loader arrives, with an historic winch-fitted tractor unit |
Derek & Ian loading the loco ,,,,, |
...... with the derailing bars removed ..... |
..... but there were still problems with the ramp vs the bogies |
E9 is on the loader ...... |
..... & ready to head for Tanfield |
At Bowes Bridge, pulling E9 forward to the ramp |
Using match waggons to control the descent (Bowes Bridge offloading siding was removed when ET became available) |
No comments:
Post a Comment